Ministry of Water and Environment – Water for Production plans to redesign and reconstruct Londoon Earth Dam in Napak District. SADRiNE CONSULTING GROUP LIMITED was contracted to carry out geotechnical investigation for purposes of the determining the condition assessment and performance levels of the existing Londoon Dam. The aim of the investigation was to;
- Determine geotechnical information including design parameters for the proposed foundations and any associated infrastructure.