The project

Feasibility Studies and Detailed Engineering Design of 2 Selected Earth Dams and Multi-Purpose Water Systems in Districts of Kaabong, Abim and Kotido

The services

Soil Investigations

Geotechnical Designs of the Earth Dam Embankment

Material Investigations

The client

Ministry of Water and Environment (Subcontract from KIM FC WATER WORKS CONSULTANCY PLC in Association with EARTH-TECH ENGINEERS LTD)

The challenge

The Ministry of Water and Environment, under the Department of Water for Production prioritized construction of earth dams and multipurpose systems and facilities in Karamoja sub region. Ministry of Water and Environment Water for Production Department contracted Sering Ingegneria srl which sub contracted SADRiNE Consulting Group Limited to undertake the consultancy services. The aim of the project was to carry out the feasibility study and the preliminary design of six selected dams for provision of water in order to provide a range of options for multi-purpose water supply for livestock and irrigation development within the project area

project-3-1.jpg
about-img-1.jpg
home-bg-1.jpg
project-1-1.jpg
project-6-1.jpg
project-5-1.jpg
project-4-1.jpg
specialization-img-1.jpg
CTA-bg-1.jpg
previous arrow
next arrow
 

The services

Scroll to Top