Buildnet construction materials and hardware limited proposed mixed developments on Plot No. 157 Block No. 214, Kisaasi, Kawempe Division, KCCA, Uganda. SADRiNE Consulting Group Limited was entrusted to carry out a thorough geotechnical investigation for the design and construction of a suitable foundation for the proposed mixed development. The scope of the services included:
- To describe and present the fieldwork and laboratory testing carried out during the investigation;
- To assess the site geotechnical characteristics of the subsoil materials with respect to suitability for the proposed developments and engineering services; and
- To recommend sound and economic development practices and initial founding guidelines to ensure long-term stability of the developments based on the geotechnical conditions encountered.